BESS project database: the battery storage project tracker
BESS Intelligence lists battery storage projects by stage, with power in MW and energy in MWh where reported.
What it covers
A project page gives the development stage and, where a source reports them, the location, power, energy and the companies in each role. Announced and operating projects are told apart, and MW is kept apart from MWh.
Questions it answers
Which battery storage projects are in planning in a market? Is this project announced, approved, under construction or operating? Is the size given as power in MW or energy in MWh?
Data files on a paid seat
Where a table can be downloaded, each file holds up to 100 rows. Each seat can download 3 files a day and 10 files a month.
An example from public information
| Field | Value | Last checked |
|---|---|---|
| Project | Nine Mile Energy Park | |
| Location | Victoria, Australia | |
| Stage | Planning permits granted on 28 May 2026. Not operating. | |
| Stage 1 power and energy | 250 MW and 500 MWh, 2 hours | |
| Stage 2 power and duration | 250 MW for 4 hours | |
| Stage 2 energy | 1 GWh | |
| Operating date | Not disclosed |
Values from the Nine Mile worked example, not a product page. A field with no stated value reads "Not disclosed".
What an analyst or market follower checks first
Check whether a project is announced or operating, and whether its size is MW or MWh, first. A 100 MW, 400 MWh project is not a 400 MW project.
Terms used on this page
- Announced project
- A project a developer has said it plans to build. It may not have permits, a contractor or a grid connection yet.
- MW
- Megawatt, a measure of power. On a battery project it is how much electricity the system can deliver at one moment.
- MWh
- Megawatt hour, a measure of energy. On a battery project it is how much electricity the system can store. Divide MWh by MW to get the hours it can run at full power.
- Operating project
- A project that is built, connected and running. Do not read an approved or announced project as operating.
Go further
- BESS Intelligence. The product these modules belong to.
- Worked example: Nine Mile. The same public example, read in full.
- How BESS Intelligence research works. Where the information comes from, dates and fields not stated.
- Developers and owners. The developer, owner or operator of a project, where a source reports it.
- EPC and integrators. The EPC line on a project page. No project names a contractor today.
- Equipment suppliers. The battery supplier line on a project page. No project names one today.
- Markets. Country and market views beside the projects.