BESS Intelligence lists battery storage projects by stage, with power in MW and energy in MWh where reported.

## An example from public information

Example for one project

| Field | Value | Last checked |
| --- | --- | --- |
| Project | Nine Mile Energy Park | 5 November 2026 |
| Location | Victoria, Australia | 5 November 2026 |
| Stage | Planning permits granted on 28 May 2026. Not operating. | 5 November 2026 |
| Stage 1 power and energy | 250 MW and 500 MWh, 2 hours | 5 November 2026 |
| Stage 2 power and duration | 250 MW for 4 hours | 5 November 2026 |
| Stage 2 energy | 1 GWh | 5 November 2026 |
| Operating date | Not disclosed | 5 November 2026 |

Values from the Nine Mile worked example, not a product page. A field with no stated value reads "Not disclosed".

## What an analyst or market follower checks first

Check whether a project is announced or operating, and whether its size is MW or MWh, first. A 100 MW, 400 MWh project is not a 400 MW project.

## Terms used on this page

- **Announced project**: A project a developer has said it plans to build. It may not have permits, a contractor or a grid connection yet.
- **MW**: Megawatt, a measure of power. On a battery project it is how much electricity the system can deliver at one moment.
- **MWh**: Megawatt hour, a measure of energy. On a battery project it is how much electricity the system can store. Divide MWh by MW to get the hours it can run at full power.
- **Operating project**: A project that is built, connected and running. Do not read an approved or announced project as operating.

## Go further

- [BESS Intelligence](https://metagnition.com/bess-intelligence/): The product these modules belong to.
- [Worked example: Nine Mile](https://metagnition.com/bess-intelligence/examples/nine-mile/): The same public example, read in full.
- [How BESS Intelligence research works](https://metagnition.com/bess-intelligence/methodology/): Where the information comes from, dates and fields not stated.
- [Developers and owners](https://metagnition.com/bess-intelligence/developers-and-owners/): The developer, owner or operator of a project, where a source reports it.
- [EPC and integrators](https://metagnition.com/bess-intelligence/epc-and-integrators/): The EPC line on a project page. No project names a contractor today.
- [Equipment suppliers](https://metagnition.com/bess-intelligence/equipment-suppliers/): The battery supplier line on a project page. No project names one today.
- [Markets](https://metagnition.com/bess-intelligence/markets/): Country and market views beside the projects.

## Related
- [BESS Intelligence](https://metagnition.com/bess-intelligence/)
- [Metagnition](https://metagnition.com/)